Anfeh – sewage treatment plant sea outfall pipeline 2005
A 700m GRP sea-outfall pipeline, offshore trench dredging, ballast, concrete weights, diffuser installation and seabed reinstatement at Anfeh.
A 700m GRP sea-outfall pipeline, offshore trench dredging, ballast, concrete weights, diffuser installation and seabed reinstatement at Anfeh.
Batroun Fishing Port – Execution Of Breakwaters, Quays And Dredging Of Marina
Saraya Aqaba Hotels and Resorts – Design Build Package For The District Cooling Plant Offshore Intake Pipeline
Saraya Aqaba Hotels And Resorts-Marine Works-Lagoon Earthworks And Flooding, Marine Walls, Water Taxis And Water Ways Construction
Cooling Plant For Power Generators – Design Build Package For The Cooling Plant Intake Pipeline, Channel And Pumping Station Basin
Marine works for Address Fujairah Resort SPA, including breakwaters, shoreline protection, beach formation and a floating-pontoon marina.
Florida Beach Resort And Hotel Construction Of Luxury Yachts Marina And Beaches With All Necessary Protection
The project consists of Design Build of 800 mm diam. GRP type Sea Water Intake Pipeline with a total length of 550 m including aspiration chamber at intake point and steel tank with pumps for total sea water output…
Design and construction of a 670 m cast-in-situ seawall along Umbrella Corniche.
Construction of 220 m of revetment protecting a newly reclaimed 15,000 sqm plot at Umbrella Beach.