Florida beach resort 2000 – 2001

Location: Al heri, lebanon
Client: Florida beach resort and hotel
Date: 2027-12-11
  • Breakwaters 300m length
  • Rock layers protection placing
  • Quay walls consisting of precast concrete blocks at level –4m including utility channels for mep and reinforce concrete capping & slab on grade
  • Construction of 1 no. slipways.
  • Dredging for quay wall foundations and breakwater toe
  • Installation of ballast layer for quay wall including soil improvement
  • Dredging of marina basin (20000m3 )
  • Asphalt works for service roads and parking areas
  • Beaches nourishment
  • Installation of all ancillary works including handrails, fenders, bollards and lighting

Florida Beach Resort And Hotel Construction Of Luxury Yachts Marina And Beaches With All Necessary Protection