Construction of 2 no. 280 Linear meters submerged breakwaters offshore made of rocks.
500 Linear meter marine walls built out of precast concrete blocks.
Dredging for breakwater foundation and toes
Excavation and dewatering for walls, water taxis and water ways construction
Around 150 linear meters of vertical stamped concrete blocks for water taxis
Temporary sheet piling
Stamped concrete slabs
Reinforced concrete retaining walls
Artificial tidal lagoon excavations (100000m4) including dewatering, offshore dredging, beach sand washing screening and reinstating.
Construction of temporary dykes to allow dewatering for lagoon excavations in dry conditions
Design and installation of temporary circulation system for first stage flagon flooding consisting of 600 linear meters intake pipeline 800mm diameter with aspiration chamber located offshore and connected to water tank with circulation capacity of 1.2m3/second
Design and installation of propeller system to provide adequate temporary circulation system for entire lagoon area upon excavation of remaining lagoon part and removal of phase i circulation system
Infrastructure works consisting of sewage network, storm network, firefighting network, irrigation network, water supply network, security network, power network
Execution of miscellaneous civil works including retaining walls,reinforced concrete slab on grade, ramps, ponds, culverts, thrust blocks & concrete bridges
Construction of artificial cascades including stone laying, artificial stone falls, stone cladding.
Stone cladding works on marine walls
Execution of miscellaneous hard landscape
Miscellaneous dewatering works for lagoon excavations, retaining walls and miscellaneous structures using well point system, deep wells and french drainage
Unconventional underpinning works for surrounding structures and walls including dewatering
Decorative handrails fabrication and installation
Installation of floating pontoons including piling works