The project consists of Design Build of 800 mm diam. GRP type Sea Water Intake Pipeline with a total length of 550 linear meters including aspiration chamber at intake point and steel tank with pumps for total sea water output capacity of 3500 m3/hr to provide fresh water for 296,000m3 men made lagoon
The work included dredging of sea bed according to required levels, placing of bedding materials, installation of GRP pipeline accessories and aspiration chamber, installation of concrete weight blocks for stabilization according to design.