Dora fishing harbor 2013 – 2018

Location: DORA, LEBANON
Client: Ministry of public work & transport-directorate general of land & maritime transport
Main Contractor: MAR GROUP
Consultant:

SEATEC S.A.R.L

  • Main & secondary rock breakwaters 500m length
  • 1000m length quay walls consisting of underwater cast in situ concrete blocks around the port perimeter at level -5m
  • Reinforced concrete capping & slab on grade
  • Utility channels for MEP
  • Construction of 2 no. slipways.
  • Construction of 6 no. piers
  • Dredging for quay walls foundation & breakwaters toe
  • Installation of ballast layer for quay walls
  • Soil improvement for quay walls foundation & reclamation area (45000m3) . Dredging of marina basin (75000m3 )
  • Construction of fish market (750m2), fisherman headquarter (250m3) in addition to 65 no. fisherman storage rooms with all finishing items and stone cladding facades
  • Construction of waste water treatment plant
  • Asphalt works for service roads and parking areas (36000m3)
  • Infra structure work (Lighting, water network & fire fighting)

DORA Fishing Port – Execution Of Quays And Dredging Of Marina

Share: