Saraya aqaba resort 1400 mm sea water intake pipeline 2018

Location: Aqaba, Jordan
Client: Eagle Hills
Main Contractor: JV- Consolidated Contractors Group S.A.L (Offshore)/ Arabtec Construction L.L.C/ Drake and Skull Construction Co. L.L.C
Consultant:

Consolidated Consultants-Turner International Middle East Ltd

Date: 2017-07-04
  • Sea water intake pipeline of 1400mm diameter and 435m length starting from -6m to -22m with a flow capacity of 3.3m3/second
  • Onshore excavation for the first 85m including shoring, dewatering and concrete protection culvert and backfilling.
  • Offshore dredging of intake pipeline channel
  • Installation of ballast layer
  • Casting and installation of precast concrete weight blocks with protective epdm rubber layer
  • Installation of 1400mm grp pipe
  • Backfilling with approved anti scouring material and reinstatement of existing sea bed
  • Supply & nstallation of aspiration chamber

Saraya Aqaba Hotels and Resorts – Design Build Package For The District Cooling Plant Offshore Intake Pipeline

Share: