Batroun fishing harbor 2009 – 2012

Location: Batroun, LEBANON
Client: Ministry of public work & transport - directorate general of land &maritime transport
Main Contractor: South for construction
Consultant:

liban consult S.A.R.L

Date: 2017-07-03
  • Breakwater of 110m length at 13m water depth connected to existing phoenician old historical wall
  • Rock layers protection placing
  • Casting & installation Concrete armour (acropode I-16m3)
  • Dredging for breakwater foundation and toes
  • Construction of crown walls
  • Sea protection revetement 600m length consisting of rocks layers and (acropode I-16m3) at -8m
  • Quay walls of 670 linear meters length consisting of cast in situ blocks underwater Concrete blocks around the port perimeter at level -5m including utility channels for mep and reinforced concrete capping & slab on grade
  • Construction of 1 no. slipways.
  • Dredging for quay wall foundations and breakwater toe
  • Dredging in hard rock for marina basin (80000 m3 )
  • Construction of 2x light houses

Batroun Fishing Port – Execution Of Breakwaters, Quays And Dredging Of Marina

Share: