Batroun fishing harbor 2009 – 2012

Batroun Fishing Port – Execution Of Breakwaters, Quays And Dredging Of Marina

Project details

Completed
Project reference
Not provided
Location
Batroun, Lebanon
Client
Ministry of Public Works & Transport – Directorate General of Land & Maritime Transport
Work packages
Not provided
Designer of the project
Libanconsult AGM
MAR executing company
Ets. Milad Abou Rjeily - General Contracting S.A.R.L
Consultant
Liban Consult S.A.R.L
Client representative
Not provided
Contract type
Not provided
Project period
2009–2012
Project award
Not provided
Commencement
Not provided
Expected completion
Not provided
Completion
Not provided
Planned operations
Not provided
MAR project role
Not provided
Main contractor
South for Construction
Subcontractor
Not provided

The project

Batroun Fishing Port – Execution Of Breakwaters, Quays And Dredging Of Marina

Scope of work

  • Breakwater of 110m length at 13m water depth connected to existing phoenician old historical wall
  • Rock layers protection placing
  • Casting & installation Concrete armour (acropode I-16m3)
  • Dredging for breakwater foundation and toes
  • Construction of crown walls
  • Sea protection revetement 600m length consisting of rocks layers and (acropode I-16m3) at -8m
  • Quay walls of 670 m length consisting of cast in situ blocks underwater Concrete blocks around the port perimeter at level -5m including utility channels for mep and reinforced concrete capping & slab on grade
  • Construction of 1 no. slipways.
  • Dredging for quay wall foundations and breakwater toe
  • Dredging in hard rock for marina basin (80000 m3 )
  • Construction of 2x light houses