Medco tank farm loading / off loading sea pipelines 2012

Location: BEIRUT-LEBANON
Client: MEDCO S.A.R.L
Main Contractor: MAR GROUP
Consultant:

Rafic Khoury Consultancy

Date: 2017-07-04
  • Sea outfall pipeline of total length 700 linear meter starting from -4m to -13m
  • Offshore dredging of pipeline channel in hard rock near shore & sand material at deeper sections
  • Installation of ballast layer
  • Casting and installation of precast concrete weight blocks with protective epdm rubber layer
  • Installation of grp pipes & diffuser
  • Backfilling with approved anti scouring material and reinstatement of existing sea bed

Sewage treatment Plant Construction- Offshore Package