Medco tank farm loading / off loading sea pipelines 2012

Location: BEIRUT-LEBANON
Client: MEDCO S.A.R.L
Main Contractor: MAR GROUP
Consultant:

Rafic Khoury Consultancy

Date: 2017-07-04
  • Supply, fabrication, jointing, welding and installation of 10 nos. steel intake pipelines (8,10 and 12 inch- 1500 lm each, water depth of -17m) including all accessories
  • Fabrication and installation of mooring buoys system at -17m depth
  • Testing and commissioning in accordance with international standards and codes

Petroleum Products Tank Farm-offshore Intake Pipelines used for loading and unloading of petroleum and gas material from and to ships

Share: