The address fujairah resort – spa – marine works

Location: FUJAIRAH-UAE
Client: EAGLE HILLS
Main Contractor: BATCO GROUP
Date: 2027-12-28
  • Two Main breakwaters 300m length each @ -6m depth including submerged parts of 155m length
  • Secondary breakwater 150m length
  • Rock revetment 600m length
  • Dredging for breakwaters & revetments foundations & toes
  • Installation & filling of 3x330m length & x2.75m diameter geotubes @ -5m depth used for beach toe protection
  • Formartion of 330m length sandy beach using 275000m3 dredged & washed/screened sand
  • Marina using floating pontoons fixed by steel guide piles

The address fujairah ressorts+spa – design build marine works packag