Skip to content
Project reference sheet
https://marcontracting.com/projects/dubai-customs-creek-quay-wall-construction-at-mina-rashid-2021/
Marine

Dubai customs creek quay wall construction at mina rashid 2021

Fast-track design and construction of a 120 m gravity-block quay wall at Mina Rashid, complete with marine furniture and MEP systems.

Project details

Completed
Project reference
Not provided
Location
Dubai, UAE
Client
DP World / Dubai Customs
Work packages
Not provided
Designer of the project
CHSS
MAR executing company
MAR Marine & Building Contracting LLC
Consultant
CHSS
Client representative
Not provided
Contract type
Design & Build
Project period
2021
Project award
Not provided
Commencement
Not provided
Expected completion
Not provided
Completion
February 2021
Planned operations
Not provided
MAR project role
Not provided
Main contractor
Not provided
Subcontractor
Not provided

The project

A fast-track design-and-build quay wall package at Mina Rashid using durable cast-in-situ gravity blocks for severe marine conditions.

Scope of work

  • 120 m quay wall with a height of 9 m
  • Cast-in-situ gravity-block construction
  • Fenders, bollards, SOS pedestals, fire-hose cabinets and street lighting
  • Associated MEP works and accessories
  • Design works, permits, approvals and NOCs
  • Demolition of the existing rock revetment and crown wall
  • Dredging of the quay-wall foundation trench
  • Placement of geotextile, geogrids and ballast rock beneath the quay wall
  • Reinforced-concrete capping beam
  • Rock revetment works at both ends of the quay wall
  • Reclamation behind the quay wall