Mina Hamriya Development works – Phase 3 – Fishermen Harbour and Facilities

A new fishermen harbour and marine facilities at Hamriya Port, Dubai, delivered for DP World through quay walls, dredging, apron infrastructure and integrated design-and-build services.

Project details

Ongoing
Project reference
016
Location
Hamriya Port, Dubai, UAE
Client
DP World UAE Region FZE
Work packages
Phases 3A and 3B
Designer of the project
M/s. Arti Proje Danismanlik Insaat- Marine Design & Consultant- CHSS
MAR executing company
MAR Marine & Building Contracting LLC
Consultant
ARTI Proje / CHSS
Client representative
CWP
Contract type
Design & Build
Project period
Not provided
Project award
13 January 2025
Commencement
Not provided
Expected completion
31 December 2026
Completion
Not provided
Planned operations
Not provided
MAR project role
Not provided
Main contractor
Not provided
Subcontractor
Not provided

The project

MAR Marine & Building Contracting is the design-and-build contractor for Mina Hamriya Development Works – Phase 3 – Fishermen Harbour and Facilities at Hamriya Port, Dubai, for DP World UAE Region FZE. The development is delivered in Phases 3A and 3B and includes new quay walls, return walls and rock revetments, dredging, an improved and paved apron, a marine operations building and complete apron MEP services and safety systems. MAR’s delivery spans concept design, environmental studies, construction and commissioning, with works performed inside a live, operating port under DP World and Trakhees requirements.

Scope of work

  • Design and construction of approximately 700 m of quay walls at a 12 m draft
  • Approximately 470,000 m³ of dredging, including cap-rock removal
  • Construction of a 76,475 m² apron with soil improvement and heavy-duty pavement
  • Construction of a new marine operations building
  • Complete apron MEP services and safety systems
  • Full design-and-build delivery, from concept design through construction to commissioning
  • Environmental Impact Assessment and coral translocation to protect the marine environment
  • Works inside a live, operating port under DP World and Trakhees requirements