Design & Build of Desalination Plant for Potable Water, PEPER

Marine works for the Doraleh desalination plant, including a pumping-station cofferdam, excavation, trench dredging and intake and discharge pipelines.

Project details

Completed
Project reference
Not provided
Location
Doraleh, Djibouti
Client
Ministry of Finance and Economy / National Office of Water and Sanitation of Djibouti (ONEAD)
Work packages
Not provided
Designer of the project
MAR Contracting SAL (Offshore)
MAR executing company
MAR Contracting SAL (Offshore) & MAR Contracting SARL
Consultant
Cabinet Merlin
Client representative
Not provided
Contract type
Design & Build
Project period
2021
Project award
Not provided
Commencement
Not provided
Expected completion
Not provided
Completion
Not provided
Planned operations
Not provided
MAR project role
Not provided
Main contractor
Eiffage Génie Civil & Tedagua JV
Subcontractor
MAR Contracting SAL (Offshore) & MAR Contracting SARL

The project

Offshore intake and cofferdam package for Djibouti’s potable-water desalination plant, covering excavation, underwater concrete, pipelines and intake infrastructure.

Scope of work

  • Dewatering & Excavation for Cofferdam from existing ground level @ +1.70m NGD to -5.70 m NGD. The excavation quantity was 2,500 m3 of hard rocks.
  • Fabrication & Installation of specially made 150 tons, 30 x 10 x 10 m steel Cofferdam @ -5.70 m NGD
  • Cast In-situ for underwater 350 m3 concrete ballast designed for cofferdam stabilizing
  • Peripheric cofferdam backfill & ballast of 950 m3 of gravel
  • Supply and underwater installation of 2 x 1400 mm & 800 mm diameter x 500 mm thickness Stainless steel flanges for connection between pipelines and pump room
  • 20,000 m3 Underwater trench of hard corals and sand dredging in front of cofferdam for pipelines from level -4.00 m NGD till level -12.00 m NGD
  • Casting of 800 units of pipeline concrete weight blocks
  • 2 HDPE Pipelines of 780 lm & 430 lm with 800 mm & 1400 mm diameter preparation and installation from -4.00 m NGD to -23.00 m NGD
  • Dredging bottom of intake chamber @ -20.00 m NGD
  • Installation of 40 tons 5.7m high x 3.3m wide GRP intake chamber and 30m2 concrete slab @ -20.00 m NGD
  • Supply and installation of 3 signalizations buoys complete systems @ -20.00 m & -25.00 m NGD
  • The 1,400 mm pipeline serves the intake; the 800 mm pipeline serves the discharge