Marassi Outer Marina Project

Location: Egypt
Client: EMAR MISR FOR DEVELOPMENT
Main Contractor: HOMAN Contracting
Consultant:

PACER

Date: 2021-12-01
  • 124m long channel @-4.50m, linking the outer marina to the inner one and limited from both sides by two underwater concrete walls.
  • Western quay wall @-4.50m (L=204.65m) / 16 berths for 30m power boats;
  • Eastern quay wall @-4.50m (L=190.38m) / 14 berths for 30m power boats and 3 berths of 18m power boats;
  • Western quay wall @-6.00m (L=237.00m) / 2 berths for 60m superyachts; As Sheet Pile QW
  • Eastern quay wall @-6.00m (L=135.85m) / 1 berth for 60m superyacht; As Sheet pile QW
  • Northern quay wall @-8.00m (L=233.12m) / 1 berth for 147m megayacht; As Sheet pile QW
  • Main and secondary breakwaters provide sufficient protection against waves attack, in addition to adjacent platforms with an average width of 50m

MARASSI OUTER MARINA BREAK WATER ( The Scope of work comprises the construction of the Marassi Outer Marina breakwaters and quay wall for the boat berthing in addition to performing the necessary design modifications ‘’ Contractor’s proposed design ‘’ according to the contract documents