Fujairah Beach Marine Works

The project consists of the following:
South Breakwater:
200 m rubble mound total lengh, of which 140 m is submerged under MSL
North Breakwater:
260 m rubble mound total length, of which 120…

Jounieh cruise port – phase 1 – 2018

Phase 1 delivered a 330m rock revetment, Acropode II armour units, soil replacement and 30,000 m2 of land reclamation for Jounieh Cruise Port.

Dora fishing harbor 2013 – 2018

DORA Fishing Port – Execution Of Quays And Dredging Of Marina

Kfoury metals commercial port 2009 – 2010

Kfoury Metals New Steel Mill Factory Construction Of Loading Quays For Ship

Marine Works for Bluewaters Causeway Project

Marine works for the east and west Bluewaters Causeway zones, including revetments, filling and stormwater outfalls.

Beirut Port — Quay 16 Extension (2011–2013)

Beirut Port-Quay 16 Extension – Construction of 600m Quay Wall at 18m depth

Afamia Beach Resort (2004–2008)

Secondary breakwater of 115 m
Rock layers placing
Concrete armoring blocks (acropode i-16m3)
Dredging for breakwater foundation and toes
Land reclamation of 22000 m2
Dredging for new quay foundations underwater in…

Anfeh – sewage treatment plant sea outfall pipeline 2005

A 700m GRP sea-outfall pipeline, offshore trench dredging, ballast, concrete weights, diffuser installation and seabed reinstatement at Anfeh.

Batroun fishing harbor 2009 – 2012

Batroun Fishing Port – Execution Of Breakwaters, Quays And Dredging Of Marina

Saraya aqaba resort 1400 mm sea water intake pipeline 2018

Saraya Aqaba Hotels and Resorts – Design Build Package For The District Cooling Plant Offshore Intake Pipeline