Skip to content

Fujairah Beach Marine Works

The project consists of the following:
South Breakwater:
200 m rubble mound total lengh, of which 140 m is submerged under MSL
North Breakwater:
260 m rubble mound total length, of which 120…

Kfoury metals commercial port 2009 – 2010

Kfoury Metals New Steel Mill Factory Construction Of Loading Quays For Ship

Marine Works for Bluewaters Causeway Project

Marine works for the east and west Bluewaters Causeway zones, including revetments, filling and stormwater outfalls.

Beirut Port — Quay 16 Extension (2011–2013)

Beirut Port-Quay 16 Extension – Construction of 600m Quay Wall at 18m depth

Afamia Beach Resort (2004–2008)

Secondary breakwater of 115 m
Rock layers placing
Concrete armoring blocks (acropode i-16m3)
Dredging for breakwater foundation and toes
Land reclamation of 22000 m2
Dredging for new quay foundations underwater in…

Jounieh cruise port – phase 1 – 2018

Phase 1 delivered a 330m rock revetment, Acropode II armour units, soil replacement and 30,000 m2 of land reclamation for Jounieh Cruise Port.

Dora fishing harbor 2013 – 2018

DORA Fishing Port – Execution Of Quays And Dredging Of Marina

Saraya aqaba resort – light house 2015 – 2016

Saraya aqaba hotels and resorts-marine works package i – construction of offshore lighthouse and breakwater

Military complex beirut 2009 – 2016

Project Consisted Of The Maintenance For The Existing Luxury Military Complex Resort And The Extension For The Facilities And Marina

Anfeh – sewage treatment plant sea outfall pipeline 2005

A 700m GRP sea-outfall pipeline, offshore trench dredging, ballast, concrete weights, diffuser installation and seabed reinstatement at Anfeh.

Contact us