Fujairah Beach Marine Works
The project consists of the following:
South Breakwater:
200 m rubble mound total lengh, of which 140 m is submerged under MSL
North Breakwater:
260 m rubble mound total length, of which 120…
The project consists of the following:
South Breakwater:
200 m rubble mound total lengh, of which 140 m is submerged under MSL
North Breakwater:
260 m rubble mound total length, of which 120…
Kfoury Metals New Steel Mill Factory Construction Of Loading Quays For Ship
Marine works for the east and west Bluewaters Causeway zones, including revetments, filling and stormwater outfalls.
Beirut Port-Quay 16 Extension – Construction of 600m Quay Wall at 18m depth
Secondary breakwater of 115 m
Rock layers placing
Concrete armoring blocks (acropode i-16m3)
Dredging for breakwater foundation and toes
Land reclamation of 22000 m2
Dredging for new quay foundations underwater in…
Phase 1 delivered a 330m rock revetment, Acropode II armour units, soil replacement and 30,000 m2 of land reclamation for Jounieh Cruise Port.
DORA Fishing Port – Execution Of Quays And Dredging Of Marina
Saraya aqaba hotels and resorts-marine works package i – construction of offshore lighthouse and breakwater
Project Consisted Of The Maintenance For The Existing Luxury Military Complex Resort And The Extension For The Facilities And Marina
A 700m GRP sea-outfall pipeline, offshore trench dredging, ballast, concrete weights, diffuser installation and seabed reinstatement at Anfeh.