Military complex beirut 2009 – 2016

Location: Beirut, LEBANON
Client: Lebanese ministry of defense
Main Contractor: MAR GROUP
Consultant:

Lebanese ministry of defense

Date: 2017-07-03
  • Channels quay walls of 375m length consisting of cast in situ arc shaped underwater concrete blocks at level -6m and 5m width including utility channels for mep and reinforce concrete capping & slab on grade
  • Construction of 250 linear meter protection wall consisting of cast in situ arc shaped Underwater concrete blocks around at level -3.5 M and width of 3m including utility channels for mep and reinforce concrete capping & slab on grade
  • Existing breakwater rehabilitation using rock layers & concrete armor blocks (acropode I-16m3)
  • Dredging for breakwater foundation and toes
  • Dredging in hard rock for sea channel and basin
  • Construction of crown walls including all utilities, stairs and architectural features

Project Consisted Of The Maintenance For The Existing Luxury Military Complex Resort And The Extension For The Facilities And Marina