Congo — Dredging Reclamation and Platform Works
Marine dredging, phased land reclamation, ground improvement and planned shore protection at the Port of Pointe-Noire.
Marine dredging, phased land reclamation, ground improvement and planned shore protection at the Port of Pointe-Noire.
Design and construction of a new quay wall for DP World at East Wharf, Jebel Ali, replacing a deteriorated sheet pile wall with a structure engineered for a 50-year service life.
Marine design and construction for the Pointe-Noire Container Terminal, including a 425 m quay wall, anchor piles, STS crane rail infrastructure and tie-ins with adjacent revetments.
Submerged detached breakwaters, groynes and beach nourishment for Marassi North Beach on Egypt’s North Coast.
A luxury-yacht marina with breakwaters, quay walls, finger piers and complete marine protection.
Dewatering and dredging works supporting hotel foundations at Ayla in Aqaba.
Deepening the existing Djibouti and Tadjourah ferry ports, including approximately 100,000 m³ of dredging and piling support works.
Breakwater, reclamation, dredging and deep-water quay construction for Phase I of Saida Commercial Port in Lebanon.
Reclamation and new revetment works for the Drydocks New Scrap Yard, including culvert extension and outfall connections.
Marine infrastructure for the modernisation of Noatum Ports Luanda Terminal, including a new deep-water STS container berth, General Cargo/Ro-Ro berth works and integrated quay facilities.