Congo — Dredging Reclamation and Platform Works
Marine dredging, phased land reclamation, ground improvement and planned shore protection at the Port of Pointe-Noire.
Marine dredging, phased land reclamation, ground improvement and planned shore protection at the Port of Pointe-Noire.
Design and construction of a new quay wall for DP World at East Wharf, Jebel Ali, replacing a deteriorated sheet pile wall with a structure engineered for a 50-year service life.
Marine design and construction for the Pointe-Noire Container Terminal, including a 425 m quay wall, anchor piles, STS crane rail infrastructure and tie-ins with adjacent revetments.
Submerged detached breakwaters, groynes and beach nourishment for Marassi North Beach on Egypt’s North Coast.
A luxury-yacht marina with breakwaters, quay walls, finger piers and complete marine protection.
Dewatering and dredging works supporting hotel foundations at Ayla in Aqaba.
Breakwater, reclamation, dredging and deep-water quay construction for Phase I of Saida Commercial Port in Lebanon.
Deepening the existing Djibouti and Tadjourah ferry ports, including approximately 100,000 m³ of dredging and piling support works.
Marine infrastructure for the modernisation of Noatum Ports Luanda Terminal, including a new deep-water STS container berth, General Cargo/Ro-Ro berth works and integrated quay facilities.
Major capital dredging works across the quay frontage, port basin, turning circle and approach channel at Pointe Noire Port.