The works for both the east and west zones of the
project consists of the following:
- Partial demolition of the existing buried breakwater,
and temporary revetments; Construction of the new
revetment. - Reconstruction of the eastern revetment further
seawards as required to accommodate the future
buildings and architectural features (Crown wall &
Utility trench), and to accommodate the relocated
district cooling pipes. - Filling of excavations with new fill material as
required to facilitate construction of the future
buildings. - Construction of new stormwater outfalls through
the revetments to serve the future building plots
and existing freefalling bridge drainage.