Beach resort 2004 – 2008

Client: Rotana Hotel
Main Contractor: MAR GROUP
Consultant:

BEST

Date: 2016-04-22
  • Main breakwater 280m length @ 18m of water depth
  • Revetment 220m lengh at @ 15m of water depth
  • Offshore Spur 100m length at 18m water
  • Installation of rock protection layers and toes
  • Concrete armore units (Acropode I – 12m3
  • Concrete crown wall
  • Installation of HDPE intake/outfall pipelines for circulation system including pumping station

Construction of Solidere Eastern Marina Revetments & Breakwater

Share: