Al jabalyan central process facility steel storage tanks 2006

Location: AL JABALYAN
Client: JAB - CPF 1
Main Contractor: RANHILL-PETRONEED
Consultant:

RANHILL-PETRONEED

The project has been executed on a fast-track basis under a “Design and Build” contract. The quay wall lengh is 120 linear meters by 9 meters height consisting of Cast in-situ Gravity blocks including all MEP and accessories such as fenders, bollards, SOS pedestal, fire hose cabinets, steel light poles etc. This type of quay wall is economical and particularly useful and durable under severe marien environmental conditions.