Chemigaz gaz plant loading / offloading sea pipelines 2010

Client: CHEMIGAZ
Main Contractor: MAR GROUP
Consultant:

CHEMIGAZ

  • Supply, erection, welding and testing of 1 no. Steel storage ranks (6000M3 capacity) including floating roof system
  • Fabrication and erection of all related piping networds, accessories
  • Testing and commissioning in accordance with international standards and codes
  • Relocation of one streel storage tank (15m height x 13m dia) including all civil works
  • Sand blasing and coating for all storage tanks

Petroleum Products Tank Farm

Share: