Execution and cladding of 900m and 8m height of Marine walls with stone cladding , 5 water taxis the cast of in-situ interlock concrete blocks system in circular and straight shapes using on site fabricated steel molds specially made to receive stamped concrete neoprene as an architectural finish, casting cascades and waterways, Retaining walls with sheet piles system.
Lagoon Excavation and Dewatering, Construction of Submerged Breakwater, Supply and installation of Quarry Run and Rocks Material, Diving and Survey works under water, Excavation and Backfilling.