Kuwait national base construction of two piers 2018 – 2019
Construction of two 130 and 90 m concrete deck on piles Cargo Piers and 3 mooring dolphins
Construction of two 130 and 90 m concrete deck on piles Cargo Piers and 3 mooring dolphins
Construction of a 1,085m marine-protection breakwater and associated dredging for Phase 2 of the Costa Brava solid-waste landfill.
Construction of Solidere Eastern Marina Revetments & Breakwater
Staircases, walkways, breakwater and accessible beach construction at the Chairman Beach House in Fujairah.
Shoreline protection, revetment, crest wall, quay wall and precast capping-beam works for Maryam Island.
MARASSI OUTER MARINA BREAK WATER ( The Scope of work comprises the construction of the Marassi Outer Marina breakwaters and quay wall for the boat berthing in addition to performing the necessary design modifications ‘’…
Marine works for the Doraleh desalination plant, including a pumping-station cofferdam, excavation, trench dredging and intake and discharge pipelines.
Fast-track design and construction of a 120 m gravity-block quay wall at Mina Rashid, complete with marine furniture and MEP systems.
Design and construction of a heavy-duty quay wall, capping beam, gantry crane infrastructure and dredged berth at Drydocks World.
Design and construction of Mina Hamriyah New Quay Berths Phases 1 and 2, including quay wall, soil improvement, apron infrastructure and dredging.