South Yard Development at Drydock Dubai — Marine Works

Design and construction of a heavy-duty quay wall, capping beam, gantry crane infrastructure and dredged berth at Drydocks World.

Project details

Completed
Project reference
011
Location
Dubai, UAE
Client
Drydocks World
Work packages
Not provided
Designer of the project
CWP / CHSS
MAR executing company
MAR Marine & Building Contracting LLC
Consultant
Bower & Octant Engineering
Client representative
Not provided
Contract type
Design & Build
Project period
2024
Project award
Not provided
Commencement
Not provided
Expected completion
Not provided
Completion
January 2024
Planned operations
Not provided
MAR project role
Not provided
Main contractor
Not provided
Subcontractor
Not provided

The project

A design-and-build redevelopment of the South Yard at Drydocks World, replacing the rock revetment with a heavy-duty operational quay.

Scope of work

  • Demolition of the existing rock revetment
  • Design & Construction of 296 LM heavy loaded quay wall handling modules of 25,000-Ton weight using secant piles method  at -12.0 m draft
  • Design & Construction of 17 m wide capping beam laidon foundation piles.
  • Supply and installation of 10 m span Gantry crane
  • Supply and installation of quay furniture ( 200 T bollards,Fenders, Ladders)
  • Dredging in front of the quay wall up to -9.5 m