DESIGN AND CONSTRUCTION OF NEW QUAY BERTH

Location: Dubai, UAE
Client: DP World
Consultant:

CHSS

Date: 2023-12-01
  • Design and construction of 1,130.00 LM of quay wall using sheet pile
    methods at -8.5 m draft including concrete capping beam
  • Soil improvement of the reclamation area using vibro-compaction method combined with the RIC
  • Design and construction of 100,000.00 SQM apron zone including but not limited to infrastructure works, pavement works, MEP works, service blocks (Pump room, substation room, Public toilets, water tank. Sewage tank)
  • Dredging of 650,000 m3 at -9.8 m

Located at Mina Al Hamriya port in Dubai, the New Quay Berths at Mina
Hamriya – Phase 1 project awarded by DP World UAE Region FZE on to
MAR Marine & Building Contracting L.L.C. as the main contractor on
11th October 2021, and CWP Engineering as a client representative.

Share: