The project consists of excavating the existing revetement and installing a 100 tonsprecast outfall chamber in the sea including environmental monitoring program.
In addition to rock revetment and soil improvement.
The project consists of the following:
South Breakwater:
200 m rubble mound total lengh, of which 140 m is submerged under MSL
North Breakwater:
260 m rubble mound total length, of which 120…
Marine works for the east and west Bluewaters Causeway zones, including revetments, filling and stormwater outfalls.
Marine works for Address Fujairah Resort SPA, including breakwaters, shoreline protection, beach formation and a floating-pontoon marina.
Design and construction of a 670 m cast-in-situ seawall along Umbrella Corniche.
Construction of 220 m of revetment protecting a newly reclaimed 15,000 sqm plot at Umbrella Beach.
Fast-track design and construction of a 120 m gravity-block quay wall at Mina Rashid, complete with marine furniture and MEP systems.
Staircases, walkways, breakwater and accessible beach construction at the Chairman Beach House in Fujairah.
Shoreline protection, revetment, crest wall, quay wall and precast capping-beam works for Maryam Island.
Design and construction of a heavy-duty quay wall, capping beam, gantry crane infrastructure and dredged berth at Drydocks World.