Jounieh cruise port – phase 1 – 2018
Phase 1 delivered a 330m rock revetment, Acropode II armour units, soil replacement and 30,000 m2 of land reclamation for Jounieh Cruise Port.
Phase 1 delivered a 330m rock revetment, Acropode II armour units, soil replacement and 30,000 m2 of land reclamation for Jounieh Cruise Port.
A 700m GRP sea-outfall pipeline, offshore trench dredging, ballast, concrete weights, diffuser installation and seabed reinstatement at Anfeh.
Batroun Fishing Port – Execution Of Breakwaters, Quays And Dredging Of Marina
Petroleum Products Tank Farm-offshore Intake Pipelines used for loading and unloading of petroleum and gas material from and to ships
Project Consisted Of The Maintenance For The Existing Luxury Military Complex Resort And The Extension For The Facilities And Marina
Cooling Plant For Power Generators – Design Build Package For The Cooling Plant Intake Pipeline, Channel And Pumping Station Basin
Florida Beach Resort And Hotel Construction Of Luxury Yachts Marina And Beaches With All Necessary Protection
Construction of a 1,085m marine-protection breakwater and associated dredging for Phase 2 of the Costa Brava solid-waste landfill.
Construction of Solidere Eastern Marina Revetments & Breakwater