Skip to content

Naame Marina 576

A luxury-yacht marina with breakwaters, quay walls, finger piers and complete marine protection.

Ets. Milad Abou Reily – General Contracting SARL

Saida Commercial Port — Phase I (2012–2015)

Breakwater, reclamation, dredging and deep-water quay construction for Phase I of Saida Commercial Port in Lebanon.

Petroleum Products Steel Tanks (1995)

Supply, erection, welding and testing of 22 petroleum-product storage tanks with associated piping, accessories and commissioning.

Apec tank farm natural gas storage sphere 2010

Construction and commissioning of a 4,000 m3 natural-gas storage sphere with its related piping networks and accessories.

IPT tank farm steel storage tank 2009

Construction of a 6,000 m3 petroleum storage tank, relocation of an existing steel tank and associated piping, coating and civil works.

Costa brava landfill- phase 1 (2015 – 2016)

Construction of a 1,200m marine-protection breakwater with rock layers, Acropode I units, toe dredging and reinforced-concrete crown walls.

Dora fishing harbor 2013 – 2018

DORA Fishing Port – Execution Of Quays And Dredging Of Marina

Kfoury metals commercial port 2009 – 2010

Kfoury Metals New Steel Mill Factory Construction Of Loading Quays For Ship

Beirut Port — Quay 16 Extension (2011–2013)

Beirut Port-Quay 16 Extension – Construction of 600m Quay Wall at 18m depth

Contact us