Skip to content

Ayla — Dewatering & Dredging

Dewatering and dredging works supporting hotel foundations at Ayla in Aqaba.

Saraya aqaba resort 1400 mm sea water intake pipeline 2018

Saraya Aqaba Hotels and Resorts – Design Build Package For The District Cooling Plant Offshore Intake Pipeline

Saraya aqaba resort – light house 2015 – 2016

Saraya aqaba hotels and resorts-marine works package i – construction of offshore lighthouse and breakwater

Saraya aqaba resort lagoon 2015 – 2016

Saraya Aqaba Hotels And Resorts-Marine Works-Lagoon Earthworks And Flooding, Marine Walls, Water Taxis And Water Ways Construction

Saraya aqaba resort construction of pumping station 2016

Design and installation of temporary shoring using soldier piling system supported with 3 layers structure steel bracing system to allow excavation to bottom of foundation level at -7.5m at a sensitive area and casting of…

Saraya aqaba resort marine walls, water taxis, water ways, retaining walls – jordan

Execution and cladding of 900m and 8m height of Marine walls with stone cladding , 5 water taxis the cast of in-situ interlock concrete blocks system in circular and straight shapes using on site fabricated steel molds…

Saraya aqaba resort 800 mm sea water intake lagoon circulation pipeline 2016

The project consists of Design Build of 800 mm diam. GRP type Sea Water Intake Pipeline with a total length of 550 m including aspiration chamber at intake point and steel tank with pumps for total sea water output…

Contact us