Ayla — Dewatering & Dredging
Dewatering and dredging works supporting hotel foundations at Ayla in Aqaba.
Dewatering and dredging works supporting hotel foundations at Ayla in Aqaba.
Saraya Aqaba Hotels and Resorts – Design Build Package For The District Cooling Plant Offshore Intake Pipeline
Saraya aqaba hotels and resorts-marine works package i – construction of offshore lighthouse and breakwater
Saraya Aqaba Hotels And Resorts-Marine Works-Lagoon Earthworks And Flooding, Marine Walls, Water Taxis And Water Ways Construction
Design and installation of temporary shoring using soldier piling system supported with 3 layers structure steel bracing system to allow excavation to bottom of foundation level at -7.5m at a sensitive area and casting of…
Execution and cladding of 900m and 8m height of Marine walls with stone cladding , 5 water taxis the cast of in-situ interlock concrete blocks system in circular and straight shapes using on site fabricated steel molds…
The project consists of Design Build of 800 mm diam. GRP type Sea Water Intake Pipeline with a total length of 550 m including aspiration chamber at intake point and steel tank with pumps for total sea water output…