Civil & Infrastructure

Saraya aqaba resort construction of pumping station 2016

Design and installation of temporary shoring using soldier piling system supported with 3 layers structure steel bracing system to allow excavation to bottom of foundation level at -7.5m at a sensitive area and casting of…

Project details

Completed
Project reference
Not provided
Location
Aqaba, Jordan
Client
Eagle Hills
Work packages
Not provided
Designer of the project
Not provided
MAR executing company
Not provided
Consultant
Consolidated Consultants / Turner International Middle East Ltd
Client representative
Not provided
Contract type
Not provided
Project period
2016
Project award
Not provided
Commencement
Not provided
Expected completion
Not provided
Completion
Not provided
Planned operations
Not provided
MAR project role
Not provided
Main contractor
JV: Consolidated Contractors Group S.A.L (Offshore) / Arabtec Construction LLC / Drake & Scull Construction Co. LLC / Drake & Scull Engineering Co. LLC
Subcontractor
Not provided

The project

Design-and-build civil package for the district-cooling plant pump house at Saraya Aqaba.

Scope of work

  • Design and installation of temporary shoring using soldier piling system supported with 3 layers structure steel bracing system to allow excavation to bottom of foundation level at -7.5m at a sensitive area and casting of reinfocre concrete pumping station surrounded by adjacent hotel from one side and the royal palace from the other side
  • Dewatering system using deep wells, bottom layer of well point system in addition to a trenching system system was selected carefully to avoid and settlement in surrounding structures
  • Foundations and walls thickness were carefully designed to withstand the uplift forces and minimum crack theory
  • Waterproofing system was selected and applied on the outer walls sides and internal side
  • Roofing system was made of precast pre-stressed beams and slabs
  • MEP and finishing works
  • Location of the structure and accessibility was challenging and pump house civil works including shoring and excavations were successfully completed in 75 days