Doraleh oil terminal rehabilitation of piers & dolphins 2012 – 2013

Rehabilitation and maintenance of Doraleh Oil Terminal piles, access ladders, fender systems, concrete decks and protective coatings.

Project details

Completed
Project reference
Not provided
Location
Djibouti, Djibouti
Client
DP World
Work packages
Not provided
Designer of the project
Not provided
MAR executing company
Not provided
Consultant
TECHNITAL
Client representative
Not provided
Contract type
Not provided
Project period
2012–2013
Project award
Not provided
Commencement
Not provided
Expected completion
Not provided
Completion
Not provided
Planned operations
Not provided
MAR project role
Not provided
Main contractor
Homan Group
Subcontractor
Not provided

The project

DORALEH OIL TERMINAL – REHABILITATION AND MAINTENANCE

Scope of work

  • Marine growth cleaning of existing tubular steel piles starting from Level -20m
  • Removal and replacement of 10 nos. Jetty access ladders
  • Maintenance of 13 nos. Super cell fender systems 5nos. (Suc1600h/re-s)& 8Nos. (Syc 1250 h/rs-s) including removal of fender frontal frame, sand Blasting, painting and replacement of friction pads in addition to replacement Of all fixing bolts system
  • Supply and installation of new (suc1600h/re-s) super cell fender systems
  • Supply and welding of zinc anodes
  • Cleaning using hydro blasting system
  • Concrete repair and application of concrete protection system on all existing concrete deck and underdeck
  • Design, supply and installation of temporary scaffolding system as a standing platform to perform the underdeck repair works
  • Sand blasting for all steel structures for access jetty, platform and mooring dolphins including supply and application of epoxy painting with all related scaffolding required for serviceability
  • Underwater hydro blasting for all piles and steel structures and specifically on The splash zones including application of special underwater epoxy protection coating system
  • Complete maintenance of existing mooring hooks