Doraleh container terminal rehabilitation of quay 2014

Location: DJIBOUTI, DJIBOUTI
Client: DP WORLD
Consultant:

EGIS

Date: 2017-07-04
  • Repairs of reinforced concrete surfaces
  • Repairs of severly damaged edges of transverse beams (concrete spalling)
  • Epoxy coating protection of 12400m2 exposed concrete surfaces.
  • Repair of 1600m2 damaged concrete on top part of quay walls capping beam
  • Repairs & epoxy coating of splash areas steel piles using blast cleaning, as per grade sa 2.5, preparation of steel substrates before application of paint and application of two-pack highly pigmented fast curing zinc-rich epoxy resin Based for steel
  • Application of shock/chemical resistant coat consisting of two-pack epoxy picaceous iron oxide coating
  • Application of corrosion polyurethane based outer coat