Congo — Dredging Reclamation and Platform Works

Marine dredging, phased land reclamation, ground improvement and planned shore protection at the Port of Pointe-Noire.

Project details

Ongoing
Project reference
Not provided
Location
Port of Pointe-Noire, Republic of Congo
Client
The Government of the Republic of Congo, represented by the Ministry of International Cooperation and the Promotion of Public-Private Partnerships
Work packages
Dredging, reclamation and platform works
Designer of the project
Corinthe Engineering Gulf and Middle East
MAR executing company
MAR Marine & Building Contracting LLC
Consultant
Not provided
Client representative
Not provided
Contract type
Not provided
Project period
2024–present
Project award
1 September 2023
Commencement
2024
Expected completion
Mid-2028
Completion
Not provided
Planned operations
Not provided
MAR project role
Main contractor
Main contractor
Not provided
Subcontractor
Not provided

The project

MAR Marine & Building Contracting LLC is delivering marine infrastructure development at the Port of Pointe-Noire for the Government of the Republic of Congo. The project combines phased dredging and land reclamation with navigation-channel dredging, additional backfilling, geotechnical investigations and specialist ground improvement. Planned rock-revetment shore protection will support future port and container terminal facilities.

Scope of work

  • Completed: Phase 1 and Phase 2 dredging and land reclamation, covering approximately 535,000 m² (53.5 ha) combined
  • Completed: geotechnical investigations, including CPT, SPT, boreholes and laboratory testing
  • Completed: initial ground-improvement trials
  • Ongoing: dredging within the navigation channel
  • Ongoing: additional backfilling and land reclamation in newly designated areas, as required by the authorities
  • Ongoing: soil improvement using vibro compaction, vibro replacement and dynamic replacement
  • Ongoing: post-improvement geotechnical verification testing
  • Planned: approximately 1,420 m of rock revetment for shore protection, comprising 650 m Southern and 770 m Northern sections
  • Planned: completion of the remaining soil improvement and verification testing
  • Planned: final inspection and handover of completed areas