Skip to content

New Scrapyard Project — Dubai Marine Works (2023)

Reclamation and new revetment works for the Drydocks New Scrap Yard, including culvert extension and outfall connections.

Al Rughaylat Port — Phases 1, 2 and 3 (Packages A, B, C and D)

Marine and landside infrastructure at Al Rughaylat Port in Fujairah, spanning breakwaters, dredging, a precast-block quay wall, a Ro-Ro ramp and harbour facilities.

Business Bay Canal Plot 3460738

Creation of a man-made island with reclamation, marine protection, access bridge and drainage infrastructure at Business Bay Canal.

RTA Al Maktoum Bridge Sheet Piles Rehab Works

Design and rehabilitation of the Al Maktoum Bridge sheet piles and associated navigation-channel and creek-bank marine structures.

Al Marjan Island — Breakwater Phases 1 & 2 (Al Danah)

Earthworks, crest walls, revetments and beach-profile reshaping along the northern and southern breakwaters at Al Danah Bay.

Mina Hamriya Development works – Phase 3 – Fishermen Harbour and Facilities

A new fishermen harbour and marine facilities at Hamriya Port, Dubai, delivered for DP World through quay walls, dredging, apron infrastructure and integrated design-and-build services.

DMC Shiplift Rehabilitation Platform and Piles

Structural rehabilitation of the 6,000T and 3,000T ship-lift platforms, capping beams, sheet-pile walls, locking supports and tubular piles.

Cape Jumeirah Marine Works MH-0123

Redevelopment of the seaward portion of the La Mer South Peninsula through reclaimed groynes, beaches and engineered marine edges.

Civil Works for Emirates Float Glass Project Line 2

Design and delivery of the civil, MEP, industrial, storage and infrastructure works for Emirates Float Glass Project Line 2 in Abu Dhabi.

DC Inspection Facility Building (G+2) with Control Tower

Construction of a G+2 customs inspection and control-tower building at the Dubai Creek entry point, Mina Rashid, including building services and external works.

Contact us