Solidere eastern marina 2018 – 2019

Location: Beirut, Lebanon
Client: Solidere S.A.L
Consultant:

Dar Al-Handasa -dar

Date: 2019-05-02

The project consists of the following:

  • South Breakwater:

200 linears meters rubble mound total lengh, of which 140 meters is submerged under MSL

  • North Breakwater:

260 linear meters rubble mound total length, of which 120 meters is submerged under MSL.

  • Outfall:

Installation of an outfall pipr for storm water at the middle of the breakwater/

  • Beach restoration:

Sea sourced sand was imported to site screened and washed to form and restore 210 linear meters by 90 meters dry sandy beach.