Description

Project Consisted Of The Maintenance For The Existing Luxury Military Complex Resort And The Extension For The Facilities And Marina

Project Specifics

  • Channels quay walls of 375m length consisting of cast in situ arc shaped underwater concrete blocks at level -6m and 5m width including utility channels for mep and reinforce concrete capping & slab on grade
  • Construction of 250 linear meter protection wall consisting of cast in situ arc shaped Underwater concrete blocks around at level -3.5 M and width of 3m including utility channels for mep and reinforce concrete capping & slab on grade
  • Existing breakwater rehabilitation using rock layers & concrete armor blocks (acropode I-16m3)
  • Dredging for breakwater foundation and toes
  • Dredging in hard rock for sea channel and basin
  • Construction of crown walls including all utilities, stairs and architectural features