KFOURY METALS COMMERCIAL PORT 2009 - 2010

Marine Construction

Share

  • Location:

    SELAATA, LEBANON

  • Client:

    KFOURY METALS

  • Main Contractor:

    MAR GROUP

  • Consultant:

    SEATEC S.A.R.L

  • Date

    2017-07-03

Description

Kfoury Metals New Steel Mill Factory Construction Of Loading Quays For Ship

Project Specifics

  • Construction of 5000 m2 loading /offloading quay
  • Quay walls consisting of underwater cast in situ concrete blocks around the perimeter at water depth ranging from level -7m to -15m
  • Reclamation within the quay walls of around 55000m3
  • Dredging of around 30000 m3 of hard rock to required foundation depth
  • Installation of underwater ballast layer
  • Revetment consisting of rock layers placing
  • Reinforced concrete capping beam including all ancillaries, mep, Fenders & bollards
  • Dredging in hard rock for surrounding berthing area
  • Floating pontoons and guide piles
  • Intake pipeline facility for power generators cooling system