Gaz plant loading / offloading sea pipelines 2010

Main Contractor: MAR GROUP
  • Fabrication, welding, installation & testing of 2 x 12 inches steel pipelines 1700 linear meter each and at 25 meter water depth used for loading and unloading of gas material from ships to storage plant and vice versa and all related accessories, marine protection and concrete weight blocks for stabilization
  • Fabrication & installation of 5 buoy system mooring berth at 25 m water depth including all related accessories

2X 1700m Sea Pipelines For Gas Material Loading/Offloading