Gaz plant loading / offloading sea pipelines 2010

Main Contractor: MAR GROUP
  • Demolition of existing rock revetment
  • Construction of 130 m rock revetment
  • Construction of Cast In-situ Crest wall at level +4.00
  • Design and Construction of 790 m Cast In-situ Quay Wall
  • Design and Construction of 790 m precastCapping Beam

Shoreline protection works including the rock, filling,
and concrete works…