Gaz plant loading / offloading sea pipelines 2010

Main Contractor: MAR GROUP
  • Constructing of Staircases and walkways on the existing rock revetment including an extension for the toe with a total length of 130 m
  • Constructing of breakwater 140 LM including core placing and filter layer and 4-6 ton armor rock
  • Beach construction including handicapped access, protected with Geotube.