FUJAIRAH BEACH

Marine Construction

Share

  • Location:

    Fujairah, UAE

  • Client:

    Eagle Hills

  • Main Contractor:

    Batco

  • Consultant:

    MCA Al Gurg

  • Date

Description

Project Specifics

The project consists of the following:

  • South Breakwater:

200 linears meters rubble mound total lengh, of which 140 meters is submerged under MSL

  • North Breakwater:

260 linear meters rubble mound total length, of which 120 meters is submerged under MSL.

  • Outfall:

Installation of an outfall pipr for storm water at the middle of the breakwater/

  • Beach restoration:

Sea sourced sand was imported to site screened and washed to form and restore 210 linear meters by 90 meters dry sandy beach.