Doraleh container terminal rehabilitation of quay 2014

Location: DJIBOUTI, DJIBOUTI
Client: DP WORLD
Consultant:

EGIS

Date: 2017-07-04
  • Constructing of Staircases and walkways on the existing rock revetment including an extension for the toe with a total length of 130 m
  • Constructing of breakwater 140 LM including core placing and filter layer and 4-6 ton armor rock
  • Beach construction including handicapped access, protected with Geotube.
Share: