DORALEH CONTAINER TERMINAL REHABILITATION OF QUAY 2014
Civil Works
Share
Location:
DJIBOUTI, DJIBOUTI
Client:
DP WORLD
Main Contractor:
HOMAN GROUP
Consultant:
EGIS
Date
2017-07-04
Description
DORALEH CONTAINER TERMINAL - REHABILITATION AND MAINTENANCE
Project Specifics
Repairs of reinforced concrete surfaces
Repairs of severly damaged edges of transverse beams (concrete spalling)
Epoxy coating protection of 12400m2 exposed concrete surfaces.
Repair of 1600m2 damaged concrete on top part of quay walls capping beam
Repairs & epoxy coating of splash areas steel piles using blast cleaning, as per grade sa 2.5, preparation of steel substrates before application of paint and application of two-pack highly pigmented fast curing zinc-rich epoxy resin Based for steel
Application of shock/chemical resistant coat consisting of two-pack epoxy picaceous iron oxide coating
Application of corrosion polyurethane based outer coat