CHEMIGAZ GAZ PLANT LOADING / OFFLOADING SEA PIPELINES 2010
Oil & Gaz Construction
Share
Location:
Client:
CHEMIGAZ
Main Contractor:
MAR GROUP
Consultant:
CHEMIGAZ
Date
Description
2 x 1700m sea pipelines for gas material loading/offloading
Project Specifics
Fabrication, welding, installation & testing of 2 x 12 inches steel pipelines 1700 linear meter each and at 25 meter water depth used for loading and unloading of gas material from ships to stoage plant and vice versa and all related accessories, marine protectuon and concrete weight blocks for stabilization.
Fabrication & installation of 5 buoy system mooring berth at 25m water depth including all related accessories.