IPT tank farm steel storage tank 2009

Location: AMCHIT-LEBANON
Client: IPT S.A.R.L
Main Contractor: MAR GROUP
Consultant:

Rafic Khoury Consultancy

  • Circular offshore concrete structure (12m diameter) consisting of unederwater cast in situ blocks with form liners to provide architectural fascades starting from 5m water depth
  • 2 No. 40m length concrete structure wing walls consisting of unederwater cast in situ blocks with form liners to provide architectural facades starting From 5m water depth
  • Dredging to required foundation depth
  • Installation of underwater ballast layer Rock layers
  • Installation in circular shape
  • Reinforced concrete capping beams
  • R.C lighthouse structure including all MEP and finishing items
  • Floating pontoons & guide piles
  • Underwater hdpe pressurized lines for sewage, electric and water supply from shore including dredging, rock protection and restoration of sea bed

Saraya aqaba hotels and resorts-marine works package i – construction of offshore lighthouse and breakwater

Share: