Al jabalyan central process facility steel storage tanks 2006

Location: AL JABALYAN
Client: JAB - CPF 1
Main Contractor: RANHILL-PETRONEED
Consultant:

RANHILL-PETRONEED

  • Sea outfall pipeline of total length 700 linear meter starting from -4m to -13m
  • Offshore dredging of pipeline channel in hard rock near shore & sand material at deeper sections
  • Installation of ballast layer
  • Casting and installation of precast concrete weight blocks with protective epdm rubber layer
  • Installation of grp pipes & diffuser
  • Backfilling with approved anti scouring material and reinstatement of existing sea bed

Sewage treatment Plant Construction- Offshore Package