Beach resort 2004 – 2008

Client: Rotana Hotel
Main Contractor: MAR GROUP
Consultant:

BEST

Date: 2016-04-22
  • Sea outfall pipeline of total length 700 linear meter starting from -4m to -13m
  • Offshore dredging of pipeline channel in hard rock near shore & sand material at deeper sections
  • Installation of ballast layer
  • Casting and installation of precast concrete weight blocks with protective epdm rubber layer
  • Installation of grp pipes & diffuser
  • Backfilling with approved anti scouring material and reinstatement of existing sea bed

Sewage treatment Plant Construction- Offshore Package

Share: