Saraya aqaba resort – light house 2015 – 2016

Location: Aqaba, jordan
Client: EAGLE HILLS
Main Contractor: JV- CONSOLIDATED CONTRACTORS GROUP S.A.L (OFFSHORE)/ ARABTEC CONSTRUCTION L.L.C/DRAKE AND SKULL CONSTRUCTION CO. L.L.C
Consultant:

CONSOLIDATED CONSULTANTS- TURNER INTERNATIONAL MIDDLE EAST Ltd

Date: 2017-07-04
  • Supply, erection, welding and testing of 1 no. Steel storage ranks (6000M3 capacity) including floating roof system
  • Fabrication and erection of all related piping networds, accessories
  • Testing and commissioning in accordance with international standards and codes
  • Relocation of one streel storage tank (15m height x 13m dia) including all civil works
  • Sand blasing and coating for all storage tanks

Petroleum Products Tank Farm

Share: