Saraya aqaba resort 1400 mm sea water intake pipeline 2018

Location: Aqaba, Jordan
Client: Eagle Hills
Main Contractor: JV- Consolidated Contractors Group S.A.L (Offshore)/ Arabtec Construction L.L.C/ Drake and Skull Construction Co. L.L.C
Consultant:

Consolidated Consultants-Turner International Middle East Ltd

Date: 2017-07-04
  • Sea outfall pipeline of total length 700 linear meter starting from -4m to -13m
  • Offshore dredging of pipeline channel in hard rock near shore & sand material at deeper sections
  • Installation of ballast layer
  • Casting and installation of precast concrete weight blocks with protective epdm rubber layer
  • Installation of grp pipes & diffuser
  • Backfilling with approved anti scouring material and reinstatement of existing sea bed

Sewage treatment Plant Construction- Offshore Package

Share: